English
English
Español
Français

User Access


McElroy Metals -  Ad - May 2022
Ad alt tag
English
English
Español
Français

Re-roofing EPDM from 1985

« Back To Roofers Talk
Author
Posts
September 6, 2011 at 5:35 p.m.

PCM Roofers

Hey,

In a situation where the original EPDM roof (from 1985) is still installed on a building I have several questions and concerns...

The flashings and seams are failing in multiple areas. The roof is ballasted with concrete 18 x 24 walk pads and river rocks all over, making it next to impossible to inspect 98% of the actual membrane without moving the pads. The condition of the flashing areas make me think it is time for a new roof and that is what I want to recommend to a client. Here are a few questions about how to proceed...

1. Can I just peel up the EPDM and re-use the ISO? ...Going over it with an asphalt primer then a SBS SA system?

2. IF not, what would be the best roof to do here? They are really down on EPDM (client) and the roof has so many small sections it doesn't make much sense anyways.

3. With a membrane this old can repairing it with patches Carlisle pressure sensitive seam tapes still work if cleaned thoroughly with weathered membrane cleaner?

THX

September 9, 2011 at 3:53 p.m.

Tin Man

I find it very strange that ANYONE, would provide a guarantee for longer then 5 yrs on a roof, other then a shingle roof with a ten year guar. for ten years. WHY would you want to be liable for a manufacters warrentee for a longer period. We give a 5 yr. guar. for Modified roofs, ten for shingles. All machanical problems show within 2 yrs.. Material has it's own obligations. Lets sue them not me.

September 7, 2011 at 5:56 p.m.

Roofguy

PCM Roofers Said: We dont do fiberglass emulsion. Would that even work, this is on the 27th floor? How expensive is the machine? ballpark?

Yeah 27 stories isn't very practical. It would work, but other systems would be better. And since it's that tall, it's probably not a lot of SQRS, right?

But to answer your question, used factory refurbished rigs start at $12,000 including training. Again, not practical for just 1 small job.

September 7, 2011 at 8:43 a.m.

PCM Roofers

We don't do fiberglass emulsion. Would that even work, this is on the 27th floor? How expensive is the machine? ballpark?

September 6, 2011 at 6:02 p.m.

Roofguy

1. Remove rock. 2. Install deck plates & screws in prescribed pattern. 3. Install chopped fiberglass/emulsion roof with or without poly frabric, depending on condition. 4. Provide 12-15 year warranty.


« Back To Roofers Talk
You must be logged in to reply to this topic.

Coffee Conversations - Banner Ad - Roofing & Homes for our Troops On Demand (Sponsored by ABC Supply)
English
English
Español
Français

User Access


Ad alt tag
McElroy Metals -  Ad - May 2022

Loading…
Loading the web debug toolbar…
Attempt #