Local code calls for 1:12 pitch on commercial roof, but NRCA says it is not considered "ponded water" unless it remains for 48-hours. Can I use the latter standard to defend my roof to a building inspector?

September 5, 2017 at 9:39 a.m.

Roofguy

Yeah I meant 1/4" in 12. Thanks for the ammo!

September 5, 2017 at 8:31 a.m.

Bob P.

I would review Chapter 1500, Section 1508 -1511 as depicted in the International Building Code (IBC) book.  Typically, local building codes either mirror or adopt what is called for in the IBC.

I don't understand why your local Building Code would require 1" per 12" slope on a commercial project when the IBC specifies 1/4" per 12" design slope requirement on new construction but exempts rerooofing from the 1/4" per 12" design slope requirement.  That in itself (IBC) may be the ammunition you need for dealing at the local level.


« Back To Roofers Talk
You must be logged in to reply to this topic.

Coffee Conversations - Banner Ad - Roofing & Homes for our Troops On Demand (Sponsored by ABC Supply)
English
English
Español
Français

User Access


Ad alt tag
McElroy Metals -  Ad - May 2022

Loading…
Loading the web debug toolbar…
Attempt #